European Data Center Construction Market is expected to reach around $+12 billion by 2027, growing at a CAGR of over +4% during 2019-2027. 

The increased procurement of renewable energy sources for data center operations, the rise in data center automation, and the emergence of Lithium-ion batteries and fuel cells are expected to drive the Europe data center construction market. Ericsson, Deutsche Telekom, Telia Sonera, Telenor, and Tele2 TDC Group along with government agencies are investing a high capital in improving internet connectivity in Western Europe and the Nordic region.

A massive research report of the European Data Center Construction Market has been presented by Report Consultant to its extensive repository. The base year considered for the study is 2019 and the forecast period is 2027. Researchers highlight the key changing trends as well as advancements in technological platforms. It has been summarized with a blend of primary and secondary research techniques.

Get Sample Copy Of this Report @ https://www.reportconsultant.com/request_sample.php?id=28049 

Europe is one of the leading active data center markets, which is expected to grow at a CAGR of +16% during the forecast period. According to the Global Interconnection Index by Equinix Frankfurt, about 70% of the data traffic is concentrated in Germany, France, Italy, Spain, and the UK. London is expected to be the largest interconnection market. 

The list of vendors in the European Data Center Construction Market is as follows:

The prominent data center construction contractors. 

AECOM, Arup Group, Bruce Shaw, Cap Ingelec, DPR Construction, Etix Everywhere, Flex Enclosure, Future-tech, Jones Engineering, KMCS, LUPP Group, Mace group, Mercury engineering, NCC, Red Engineering, Skanska, SISK Group, and Structure Tone

The prominent infrastructure providers.

ABB, Bosch Security, Caterpillar, Cummins, Eaton, EURO-DIESEL, Hitec Power Protection, KOHLER, Legrand Group, MTU OnSite Energy, Nlyte Software, Piller Power Systems, Riello UPS, Rittal, Schneider Electric, Socomec Group, STULZ, and Vertiv

Centers are the prominent data center investors.

Adgar, Advania Data Centers, Apple, Aruba, AWS, Colt Data Centre Services (COLT DCS), CyrusOne, Digital Realty, Equinix, Facebook, Google, Global Switch, Iliad Data Center, Interxion, IXcellerate, Microsoft, NTT Communications, OVH, STT GDC, T-Systems, and T5 Data

For more information: https://www.reportconsultant.com/enquiry_before_buying.php?id=28049

Reasons to purchase this research report:
  • It offers a complete analysis of changing the market scenario
  • It offers better insights into European Data Center Construction Market
  • Profiling of leading key players, and vendors
  • It offers an estimation of market value and market shares
  • To get a detailed informative data of competitors
Furthermore, it takes a closer look at various norms, government policies, rules, and regulations. This research has been done with proven research methodologies like qualitative and quantitative research methodologies. Different infographics have been used while curating the report of the European Data Center Construction market. The report profiles a few of the companies operating in the market. Buyers Get Up To 50% Discount on this Report @ Click Here: https://www.reportconsultant.com/ask_for_discount.php?id=28049 This specific report offers in-depth insights for boosting the performance of the companies. The utilization and increasing needs and will drive the European Data Center Construction Market in the forecast period. It incorporates massive data of the target market with respect to various terminologies. With the help of a research report, various readers can formulate complex business decisions by evaluating challenges in front of the businesses. In this study, the years considered to estimate the market size of European Data Center Construction Market: History Year: 2013 – 2018 Base Year: 2018 Estimated Year: 2019 Forecast Year: 2019 – 2027 Contact us: Rebecca Parker (Report Consultant) Overland Park, United States. Contact No: +1 620-220-2270 sales@reportconsultant.com    www.reportconsultant.com